Algorithm
DM shares = top discovery signal
Saves critical for Feed + Explore
Hashtag weighting reduced significantly
First 30–90 min determines push
Carousel · 8 slides · 1080×1350px
99.9% accuracy on every part. Here's how.
SLIDE 01 — Cover
99.9% inventory accuracy.
On flight hardware. First try.
Here's what ispace did differently. →
SLIDE 02
ispace is building lunar landers for Mission 3.
Target: Moon's far side. NET 2027.
With hardware this complex, one missing part = mission delay.
SLIDE 03
Their problem:
Legacy ERP built for the wrong kind of manufacturing.
High-volume, low-mix tooling
≠
Low-volume, high-mix lunar hardware
SLIDE 04
The fix: Digital work plans with click-by-click logging.
Who did each step.
When they did it.
Photo attached.
Timestamp locked in.
SLIDE 05
Three countries. One platform.
US → Luxembourg → Japan
Same data. Same compliance baseline. Real time.
SLIDE 06
Colorado engineers now watch ISO 7 clean room ops in Luxembourg.
Live. Without entering the room.
SLIDE 07
The result:
99.9%
inventory accuracy
first count
Multimillion-dollar portfolio. Fully traced.
SLIDE 08 — CTA
Save this for the next conversation about aerospace ops.
Full case study: link in bio
Follow @boltline for more on manufacturing for complex hardware
Caption: When you're building hardware for the Moon, traceability isn't optional. ispace hit 99.9% inventory accuracy on their first full count after switching to Boltline. Here's exactly how they got there.
Save this for reference → Link in bio for the full case study
#AerospaceManufacturing #SpaceExploration #Traceability #ispace #Boltline #NewSpace
Reel Script · 30 seconds
Stop. 99.9% accuracy on Moon hardware.
0–3 sec
Hook
A company building lunar landers just hit 99.9% inventory accuracy on their first count. Here's how.
3–23 sec
Value
ispace is prepping for Mission 3 — target: the far side of the Moon.
Problem: their old system couldn't track a multimillion-dollar hardware portfolio across three countries.
Fix: Boltline. Click-by-click work plans, real-time photo docs, remote clean room monitoring.
Result: 99.9% on the first count.
23–30 sec
CTA
Save this. Link in bio for the full breakdown.
Story Sequence · 5 stories
Poll-led engagement sequence
Story 1 — Poll
POLL: Does your team have full traceability on every hardware component?
YES, fully traced ✓
NO, big gaps ✗
Story 2 — Setup
Here's why I'm asking…
ispace needed 99.9% accuracy on flight hardware before Mission 3.
Most teams don't know their real number.
Story 3 — Value
What they built:
→ Digital work plans
→ Real-time photo docs
→ Remote clean room monitoring
→ 3 countries, 1 platform
Story 4 — Result
First count: 99.9%
Multimillion-dollar flight hardware portfolio.
That's the gap between paper travelers and a real traceability system.
Story 5 — CTA
Full case study in bio link ↑
DM me "TRACE" for the direct link