Instagram · 3 pieces

Instagram Content

1 carousel
1 Reel script
5-story sequence
Post Mon/Wed/Fri 11 AM local
Algorithm DM shares = top discovery signal Saves critical for Feed + Explore Hashtag weighting reduced significantly First 30–90 min determines push
Carousel · 8 slides · 1080×1350px

99.9% accuracy on every part. Here's how.

SLIDE 01 — Cover
99.9% inventory accuracy. On flight hardware. First try. Here's what ispace did differently. →
SLIDE 02
ispace is building lunar landers for Mission 3. Target: Moon's far side. NET 2027. With hardware this complex, one missing part = mission delay.
SLIDE 03
Their problem: Legacy ERP built for the wrong kind of manufacturing. High-volume, low-mix tooling ≠ Low-volume, high-mix lunar hardware
SLIDE 04
The fix: Digital work plans with click-by-click logging. Who did each step. When they did it. Photo attached. Timestamp locked in.
SLIDE 05
Three countries. One platform. US → Luxembourg → Japan Same data. Same compliance baseline. Real time.
SLIDE 06
Colorado engineers now watch ISO 7 clean room ops in Luxembourg. Live. Without entering the room.
SLIDE 07
The result: 99.9% inventory accuracy first count Multimillion-dollar portfolio. Fully traced.
SLIDE 08 — CTA
Save this for the next conversation about aerospace ops. Full case study: link in bio Follow @boltline for more on manufacturing for complex hardware
Caption: When you're building hardware for the Moon, traceability isn't optional. ispace hit 99.9% inventory accuracy on their first full count after switching to Boltline. Here's exactly how they got there.

Save this for reference → Link in bio for the full case study

#AerospaceManufacturing #SpaceExploration #Traceability #ispace #Boltline #NewSpace
Reel Script · 30 seconds

Stop. 99.9% accuracy on Moon hardware.

0–3 sec
Hook
A company building lunar landers just hit 99.9% inventory accuracy on their first count. Here's how.
3–23 sec
Value
ispace is prepping for Mission 3 — target: the far side of the Moon. Problem: their old system couldn't track a multimillion-dollar hardware portfolio across three countries. Fix: Boltline. Click-by-click work plans, real-time photo docs, remote clean room monitoring. Result: 99.9% on the first count.
23–30 sec
CTA
Save this. Link in bio for the full breakdown.
Story Sequence · 5 stories

Poll-led engagement sequence

Story 1 — Poll
POLL: Does your team have full traceability on every hardware component?

YES, fully traced ✓
NO, big gaps ✗
Story 2 — Setup
Here's why I'm asking…

ispace needed 99.9% accuracy on flight hardware before Mission 3.

Most teams don't know their real number.
Story 3 — Value
What they built:
→ Digital work plans
→ Real-time photo docs
→ Remote clean room monitoring
→ 3 countries, 1 platform
Story 4 — Result
First count: 99.9%

Multimillion-dollar flight hardware portfolio.

That's the gap between paper travelers and a real traceability system.
Story 5 — CTA
Full case study in bio link ↑

DM me "TRACE" for the direct link